您现在的位置:
装饰首页 > 装饰指南 > 深圳办公室装修

怎么在装饰过程中进行施工检验

来源:博盛达    发布时间:2013-9-19 11:08:56

            怎么在装饰过程中进行施工检验
  欢喜居家,中秋佳节,家人聚会,正准备装饰新家的装友挑选家装公司后就会十分重视装饰质量,欢喜空间小博士这期带给装友的正是怎么检验和监督装饰质量的常识。通常房子装饰别离分为水电检验、泥木检验和竣工检验:如何在装修过程中进行施工验收
  1、水电检验需求注意:强弱电通路测验,强弱电箱锁扣及线管固定,电线分色,镜前灯弯管出墙,线盒锁扣、连接器、线盒留根,顶部线管固定,水管、电管、燃气管、插座相互间的距离及固定,水管压力24小时测验,现场核对工程量,剩下资料清点;
  2、瓷砖铺贴后外观铺贴排版要合理,施工过程中砂浆丰满,门槛石刺进墙体3-5厘米,厨卫需求墙砖压地砖,瓷砖平坦度在3毫米内,墙面瓷砖笔直度在2毫米内,瓷砖阴阳角差错在3毫米内,瓷砖接缝凹凸差在0.5毫米。木作吊顶注意石膏板对接采用错缝,根底木龙骨要调查是不是是烘干的龙骨,注意重视环保象征;
  3、竣工检验首要涉及到木门、地板、衣柜、橱柜等,木门装置检验能够经过对角线测距,地板装置后感官平坦、无坍陷、无损伤等,衣柜装置和墙体接口合理,柜门滑动顺滑、平开门开关灵敏。
  How in the decorative process for construction inspection
   Happy home, the Mid-Autumn Festival, family gatherings, is preparing to decorate a new home improvement company selected after loading the Friends will attach great importance to the quality of decor, this issue brings joy Space Doctor installed exactly how friendly decorative quality inspection and supervision of common sense. Usually divided into hydro test house decoration parting CARPENTER inspection and completion of inspection:
   1, water testing requirements Note: the strength of electrical pathway tests, the strength of electrical box lock and fixed line pipe, wire separation, mirror light pipe out of the wall, box lock, connectors, junction boxes remain the root, the top fixed line pipe, water pipes, electric pipes, gas pipes, sockets and fixed distance from each other, 24 hours water pressure test, on-site verification of quantities, the remaining data inventory;
   2, after the appearance of the tiling tiling layout to be reasonable, the construction process mortar plump, stone threshold pierce the wall 3-5 cm, kitchen wall tiles demand pressure, brick, tile flatness within 3 mm, wall tiles straight degree to 2 mm, tile Yang angle error of 3 mm, the tile joints differential unevenness of 0.5 mm. Note wooden ceiling gypsum board butt joints using wrong, root wood keel is not to investigate the keel is dried, environmentally conscious attention symbol;
   3, the completion of the primary test involves doors, flooring, wardrobes, cabinets, etc., can be tested through the diagonal wooden devices ranging, flooring after installation senses flat, no collapse, no damage, etc., wardrobe unit and wall interfaces reasonable, doors smooth sliding, swing switch sensitive.